中文
 

Follow us 

Hot Topic
Market News
Events & Promo
Career Tips
Education News
Health & Life
JA Solar Begins Module Deliveries for Masdar's World-First 24/7 Gigascale Clean Energy Project
PRNewswire

JA Solar Begins Module Deliveries for Masdar's World-First 24/7 Gigascale Clean Energy Project

Publish date: 16 Jul 2026

Follow us

Stay updated on the job market

Popular Articles

【DSE放榜2026】升學專家拆解5大分數出路!幾多分穩入八大?JUPAS改選策略一文睇清
【DSE放榜2026】升學專家拆解5大分數出路!幾多分穩入八大?JUPAS改選策略一文睇清
「香港電腦通訊節 2026」8月登場推動「全民AI」落地助市民、企業數碼技能大升級
「香港電腦通訊節 2026」8月登場推動「全民AI」落地助市民、企業數碼技能大升級
【日本城改名】再見日本城!7.15起易名「JHC真好城」 網民笑爆:以為係中式酒樓名?母企解構原因
【日本城改名】再見日本城!7.15起易名「JHC真好城」 網民笑爆:以為係中式酒樓名?母企解構原因
【網民熱話】世界盃未踢完已勁輸30萬!月入萬七保安賭波泥足深陷 走火入魔急求「呢樣嘢」震驚網民
【網民熱話】世界盃未踢完已勁輸30萬!月入萬七保安賭波泥足深陷 走火入魔急求「呢樣嘢」震驚網民
【職場文化】8個最反智嘅Office潛規則!網民:最後嗰個直頭是精神虐待
【職場文化】8個最反智嘅Office潛規則!網民:最後嗰個直頭是精神虐待

BEIJING, July 16, 2026 /PRNewswire/ -- JA Solar has reached a significant milestone in its cooperation with Masdar, with the successful shipment of the first batch of PV modules to the landmark Round-the Clock (RTC) project in Abu Dhabi in July 2026.

JA Solar Begins Module Deliveries for Masdar's World-First 24/7 Gigascale Clean Energy Project
JA Solar Begins Module Deliveries for Masdar's World-First 24/7 Gigascale Clean Energy Project

Following its selection in 2025 as one of the preferred suppliers for a 3GW module supply order, JA Solar is set to play an important role in supporting one of Abu Dhabi's major renewable energy projects. The project also demonstrates that JA Solar's product solutions have become a preferred choice for green power supply in AI computing, earning recognition from world-class AI energy projects.

Located in the Al Dhafra area of Abu Dhabi, the RTC solar-plus-storage project is designed to deliver 24/7 clean power through an integrated renewable energy and storage system. Combining a 5.2 gigawatt solar photovoltaic (PV) facility, integrated with a massive 19 gigawatt-hour (GWh) battery storage system, this will be the largest and most technologically advanced solar-plus-storage project on the planet, providing 1GW of baseload power on daily basis.

It is expected to be fully operational in 2027, with its electricity dedicated to powering the increase in energy demand driven by economic growth and new AI infrastructure.

JA Solar's role in the project reflects the company's growing recognition in global markets, supported by its global operations, reliable delivery capabilities and localized service network. The project also positions JA Solar's flagship DeepBlue modules as a trusted solution for large-scale renewable energy projects and energy infrastructure built around the needs of AI computing.

Designed for demanding energy applications, DeepBlue modules are well suited to the power requirements of AI infrastructure. They address the core requirements of AI data center energy projects, including continuous high-load operation, resilience in extreme climates, stringent safety standards, lower maintenance needs and large-scale deployment.

As global demand for computing power continues to climb, AI data centers are becoming an increasingly important source of electricity consumption in the digital age. JA Solar has remained closely engaged with the development of the AI computing industry. During Intersolar Europe 2026 in Munich, the company and Deloitte jointly released the white paper Driving Greener Artificial Intelligence with the Green Token Indicator. The paper introduced green attributes into units of AI computation, marking a shift from green electricity to greener computing. It also proposed a measurable framework for assessing and managing AI's environmental impact.

From supporting reliable gigawatt-scale supplies of clean power to helping shape measurable standards for green computing, JA Solar is linking the development of photovoltaic technology more closely with the future of the AI industry. Through continuously upgraded product solutions and forward-looking industry insights, the company is helping build a clean-energy foundation for AI-driven growth.

Contact: marketing@jasolar.com

Follow us

Stay updated on the job market

Popular Articles

【DSE放榜2026】升學專家拆解5大分數出路!幾多分穩入八大?JUPAS改選策略一文睇清
【DSE放榜2026】升學專家拆解5大分數出路!幾多分穩入八大?JUPAS改選策略一文睇清
「香港電腦通訊節 2026」8月登場推動「全民AI」落地助市民、企業數碼技能大升級
「香港電腦通訊節 2026」8月登場推動「全民AI」落地助市民、企業數碼技能大升級
【日本城改名】再見日本城!7.15起易名「JHC真好城」 網民笑爆:以為係中式酒樓名?母企解構原因
【日本城改名】再見日本城!7.15起易名「JHC真好城」 網民笑爆:以為係中式酒樓名?母企解構原因
【網民熱話】世界盃未踢完已勁輸30萬!月入萬七保安賭波泥足深陷 走火入魔急求「呢樣嘢」震驚網民
【網民熱話】世界盃未踢完已勁輸30萬!月入萬七保安賭波泥足深陷 走火入魔急求「呢樣嘢」震驚網民
【職場文化】8個最反智嘅Office潛規則!網民:最後嗰個直頭是精神虐待
【職場文化】8個最反智嘅Office潛規則!網民:最後嗰個直頭是精神虐待

Hottest Tags

#JUPAS改選
#DSE出路
#八大分數
#大學聯招
#幾多分穩入八大
#DSE分數出路
#JUPAS改選策略
#JUPAS排位教學
#DSE 21分出路
#DSE 17-20分出路
#DSE 16分出路
#DSE中英文唔及格

Contact Us
Notice
Back to Top
We use cookies to enhance your experience on our website. Please read and confirm your agreement to our Privacy Policy and Terms and Conditions before continue to browse our website. Read and Agreed